Otter Lake Solid Waste Management Facility
  The 200-acre Otter Lake Facility was designed to accept all solid waste generated by the Halifax Regional Municipality (HRM) that is not diverted to either of HRM’s two composting facilities or materials recovery facility. The goal of this facility is to ensure that the only material entering the landfill is stable, inert or residual in nature.


 

Three key buildings were constructed for the solid waste management process, the Front End Processing Facility, the Waste Stabilization Facility with Biofilter and the Residual Disposal Facility. Construction occurred over one year and the facility is designed to operate for 25 years.

 
Municipal Contracting Limited Dexter Construction Envirosoil Dexter Institute Mirror © 2004 Municipal Group