Cabot Trail Restoration
Beginning at the entrance to the Cape Breton Highlands National Park, this project consisted of reconstructing approximately 4km of existing Cabot Trail at Ingonish, complete with:
- 10,500m3 of excavation
- 9000m3 of burrow
- 1347m of pipe
- 40,300t of gravel
- 7800t of asphalt
- 3.87x4.93m shaw span
Along with extensive roadwork rehabilitation , we installed a golf cart underpass, 475m2 of T-wall retaining walls, a new water main, signing and lighting, and replaced existing culverts and catch basins.