PROJECT CATEGORY:
Marine Work
CLIENT:
Husky Energy
LOCATION:
Placentia, N.L.
SCOPE OF WORK:
- Mass excavation of approximately 1.3 million cubic meters of material behind a natural coastal berm, which was hauled and dumped into nearby pond for infill
- Installation of temporary and permanent de-watering systems around the perimeter of the graving dock, including 83 dewatering wells (830 L/sec), 33 piezometers, 2 lift stations, 1,000 meters of HDPE dewatering pipe and 2 sedimentation ponds c/w geomembrane lining
- Construction of over 27,000 square meters of soil-cement-bentonite cut-off walls to minimize water flow into the dock area
- Installation of permanent power distribution systems
- Construction and renewal of 1,500 meters of new site access road
- Successfully completed in 2015