Roundabout construction, along with subgrade, drainage and paving work, for new exit/entrance ramps as part of 100 Series Highway 101 Twinning Project.
Gravel supply and placement, asphalt paving and all related works, including concrete curb, sewer and guard rail, for new Ikea store which opened in fall 2017.
Five-month project that entailed the building of a 3.5km water collection canal complete with excavation, lining, measuring station and two HDPE lined settling basins.